50 rooms hotel + 4 apartments in Brussels, Belgium
The project includes:
- Dual-Flow Ventilation
- Individual Dual-Flow ventilation for the 4 apartments
- Gas boilers low-temperature heating (55/40⁰C)
- Gas boilers hot water production
- Sewage and plumbing
- Rainwater tank
Architect: Eric Vandenblock, Atelier A3
Stability engineer: Matthieu Collard, Fraiture Promo Consult s.a.
Project Management: Phicap sprl
Interior design: Michelle Peneman